Home Page

Approach Projects
Construction
Photo Album
Construction
Timetable
>

Photo Album
> Archive Listing

Photo Archive

The most recent set of construction photos appear on the main Photo Album page.

June 2002 – Lead engineers view Pier 37; Crawfish Boil
Lead engineers from HNTB Corporation, the bridge design and project management team, visit the pier 37 site on June 7.
The tour group looks out over the Mississippi River from the top of the cutting edge.
The tour group looks out over the Mississippi River from the top of the cutting edge.
The tour group looks out over the Mississippi River from the top of the cutting edge.
Project team members from MDOT, HNTB and Massman-Traylor JV gather near Lake Village, Arkansas for a time-honored Southern tradition, the crawfish boil.
On the menu: boiled crawfish and corn on the cob.
The main course.
Dig in!